SB Energy, Inc. is the rare 2027 IPO candidate whose prospectus is already public. It filed a Form S-1 on September 1, 2026, planned a roadshow for the week of September 21, then held the deal when investors balked at a valuation of about $50 billion (IFR). Amendment No. 3, filed November 19, 2026, adds third-quarter financials and confirms the ticker SBE on the Nasdaq Global Select Market and Nasdaq Texas, but the price range is still blank. The equity story is a contracted one: $439 billion of backlog, almost all of it from leases with two related parties, SoftBank and OpenAI, with OpenAI's 8.0 GW Ohio campus backed by a $105 billion NVIDIA residual value guaranty. The operating story is still ahead of it: no data center capacity is in operation, revenue was $213.5 million in 2025 and came almost entirely from solar and storage, and delivering the backlog takes an estimated $176 billion of capex over about six years. The IPO asks public investors to pay for leases that start paying out from 2028.
Backlog, capex, revenue and loss figures are from SB Energy's S-1/A No. 3 (November 19, 2026). The valuation target is press reporting (Reuters in May 2026; IFR in September 2026) and does not appear in the filing, which leaves the price range and share count blank.
| Item | Detail |
|---|---|
| Registrant | SB Energy, Inc. · Texas corporation (converted from Delaware August 28, 2026) · SEC CIK 0002133037 · formerly SE Global Holdings |
| Headquarters | 3 Lagoon Drive, Suite 280, Redwood City, California |
| Founded | 2019 by SoftBank Group, as a power infrastructure business |
| Leadership | Co-Chief Executive Officers Rich Hossfeld and Abhijeet Sathe |
| People | 251 full-time employees and 108 contractors (September 30, 2026) |
| Segments | Data centers (DC) and solar, storage and power (SP) |
| Data center portfolio | 8.8 GW-IT under signed leases: 0.8 GW-IT under construction (Cosmos, Milam County Buildings 1 and 2) and the 8.0 GW-IT PORTS-Pike Technology Campus in Ohio, contracted but not yet under construction |
| Power portfolio | 5.5 GWac operating, under construction or contracted: about 2.2 GWac of solar and battery storage in service, about 2.5 GWac in construction, 0.8 GWac more contracted |
| Track record | 4.7 GWac of solar and storage developed, financed and started since 2019; 24 customers; 37 project financings; acquired data center builder Studio 151 in 2025 |
| Strategic holders | SoftBank (controlling shareholder and tenant) · OpenAI (tenant and warrant holder) · NVIDIA (residual value guarantor and future Class N holder) |
SB Energy began as SoftBank's renewable power developer and pivoted in 2025 toward AI data centers, keeping the power business as its source of revenue today. Its pitch is "power-first": it builds the generation and grid connection alongside the data halls, so customers get capacity sooner. The prospectus calls time to energization "the defining variable in data center development." Three campuses carry signed leases. Cosmos in Travis County, Texas is a roughly 50 MW research campus leased to a SoftBank affiliate for 15 years. Milam County, Texas has two buildings of about 308 MW and 445 MW leased to an OpenAI affiliate for 15 years. PORTS-Pike in Pike County, Ohio, on a former Department of Energy uranium-enrichment site, is planned as 17 buildings of about 472 MW each under separate 20-year leases to OpenAI, supported by about 10 GW of grid power and an initial 9.2 GW of new gas-fired generation.
Filing status here is read directly from SEC EDGAR. SB Energy skipped the quiet route Wonder and OpenAI took: it filed in public, so its financial statements, risk factors and contracts are already readable. What is missing is the deal itself: the price range, the share count and therefore the valuation.
| Date | Event | What changed |
|---|---|---|
| August 17, 2026 | NVIDIA prepaid forward and PORTS-Pike guaranty | NVIDIA prepays $1.5B for Class N shares at 90% of the IPO price; announces the guaranty for the Ohio campus |
| September 1, 2026 | Public Form S-1 | First public prospectus (Registration No. 333-298675) |
| September 4, 2026 | S-1/A No. 1 | Exhibits only |
| September 21, 2026 | S-1/A No. 2 · planned roadshow week | Discloses the NVIDIA prepaid forward; banks hold the launch over valuation (IFR) |
| October 22, 2026 | Press report | The Information: SB Energy weighing a December 2026 or 2027 listing |
| November 19, 2026 | S-1/A No. 3 | Adds results for the nine months to September 30, 2026; ticker SBE on Nasdaq Global Select and Nasdaq Texas; price range still blank |
The syndicate is one of the largest on file: 21 underwriters, with J.P. Morgan, Goldman Sachs and Morgan Stanley as representatives and Citigroup and Mizuho among the lead books (IFR). The usual next step is a price-range amendment followed by a roadshow of one to two weeks. A practical deadline sits behind the timing: the filing's latest financial statements are as of September 30, 2026, and SEC staleness rules generally require newer audited figures for an IPO priced roughly 135 days after that date, which falls in mid-February 2027.
SB Energy defines backlog as revenue still to be recognized under binding contracts. It excludes merchant power sales and uncontracted renewals. As of the prospectus date it totals about $439 billion: $430 billion in the data center segment and $10 billion in power. The weighted average remaining contract length is 19.6 years for data centers and 16.5 years for power. Two facts dominate the number:
| Campus | Tenant | Critical IT capacity | Lease | Status |
|---|---|---|---|---|
| Cosmos Research Campus, Travis County, Texas | SoftBank affiliate | ~50 MW | 15 years · ~$2.5B aggregate rent · SoftBank guaranty ~$2.9B | Under construction · rent starts the earlier of December 11, 2026 or ready-for-service |
| Milam County Buildings 1 and 2, Texas | OpenAI affiliate | ~308 MW + ~445 MW | 15 years each · two 10-year extensions · yield-on-cost rent with escalator | Under construction |
| PORTS-Pike Technology Campus, Pike County, Ohio | OpenAI | ~8.0 GW (17 × ~472 MW) | 17 separate 20-year triple-net leases | Contracted, not yet under construction · phased delivery reported from 2028 |
First, every signed data center lease is with SoftBank or OpenAI; the prospectus says there are no unaffiliated data center tenants, and talks with other hyperscalers have produced no definitive agreements. Second, PORTS-Pike is all of the contracted-but-not-started capacity and "a substantial majority" of data center backlog. Because OpenAI "is not currently an investment-grade tenant," the campus's financeability rests on NVIDIA's residual value guaranty. That guaranty covers only the first 4.25 GW-IT of the 8.0 GW-IT, is capped at $105 billion, declines over each 20-year lease, pays only on tenant insolvency or an uncured monetary default, and ends automatically if OpenAI Group PBC earns a designated credit rating. The remaining 3.78 GW-IT has only an option for NVIDIA to guarantee, at its sole discretion.
| Line | 2024 | 2025 | 9 months 2026 |
|---|---|---|---|
| Total revenue | $232.2M | $213.5M | $177.1M |
| of which revenue from contracts with customers | $100.6M | $143.0M | $109.8M |
| of which unrealized change in fair value of power swaps | $119.3M | $63.3M | $59.0M |
| Net income (loss) attributable to SB Energy | $106.1M | −$738.0M | −$1,913.7M |
| Stock-based compensation (non-cash) | $140.3M | $674.1M | $593.6M |
| Warrant liability fair-value change (non-cash) | — | — | $1,202.8M |
| Net income (loss) excluding those non-cash items (company measure) | $246.4M | −$63.9M | −$117.3M |
Three things stand out. Revenue has not grown: it is still a solar and storage business, and a sizeable share of the top line is unrealized gains on power price swaps, not cash from customers. The headline losses are mostly non-cash: the $1.2 billion warrant charge in 2026 is the remeasurement of outstanding warrants to fair value (OpenAI and Ares hold the company's warrants), and stock compensation ran at $674.1 million in 2025. And the balance sheet is thin for the plan: at September 30, 2026 the company held $996.7 million of unrestricted cash, $1,155.6 million of restricted cash and $1.9 billion of undrawn committed credit, against $4.6 billion of debt, of which $1.2 billion is current. The largest near-term maturity is the Pelicans Jaw facility, about $874.8 million due by March 2027. Accumulated deficit reached $2.51 billion.
The prospectus estimates $176 billion of capex tied to contracted projects alone, about 31% in years 0–2, 41% in years 2–4 and 28% in years 4–6. That is roughly $55 billion in the first two years (QuantLogix arithmetic). The reported IPO raise of $5–7 billion (The Information) plus NVIDIA's $3.0 billion covers a small fraction; the rest has to come from project-level debt secured on the leases, which is why the NVIDIA guaranty and OpenAI's credit standing carry so much weight. The IPO is a down payment on the build, not its funding.
| Holder | Instrument | Terms |
|---|---|---|
| SoftBank Group | Common stock (controlling) | Keeps voting control after the IPO; SB Energy will be a Nasdaq "controlled company" and intends to use the governance exemptions. Post-IPO percentages are blank in the filing |
| NVIDIA | Class N common stock (non-voting) | $1.5B prepaid forward (August 17, 2026) at 90% of the IPO price, plus a $1.5B concurrent private placement at the IPO price: $3.0B in total. The IPO is not conditioned on either |
| OpenAI | Warrants | 3,991,809 warrants (amended and restated August 17, 2026). 1,737,867 are net-exercised automatically at the IPO; 2,253,942 stay unvested |
| Ares Management | Preferred equity and warrants | Preferred equity redeemed in full and warrants cash net-settled, expected before or substantially concurrently with the offering |
| IPO investors | Common stock | Up to 5% reserved for a directed share program; 180-day lock-up for existing holders |
The structure is close to Anthropic's: Anthropic sold $26 billion of non-voting Class N stock to strategic partners, NVIDIA among them, alongside its November 2026 IPO. Here the strategic partners are also the tenants and the guarantor. The prospectus is direct that a dispute with SoftBank or OpenAI "could be complicated by SoftBank's controlling interest," and that the board may face conflicts enforcing rights against a related-party tenant.
No private round has priced the company; the only marks are reported IPO targets. Reuters reported in May 2026 that SB Energy was aiming for about $50 billion. IFR reported in September that it hoped to raise at least $5 billion at that valuation but that premarketing interest came in below it ("the valuation gap is a big issue," a banker told IFR). The Information reported in October that banks had put the value at about $60 billion and that investors found it hard to accept because the valuation rests on future leases.
| Yardstick | At $50B | Basis |
|---|---|---|
| Price to 2025 revenue | ~234× | $50B ÷ $213.5M (QuantLogix arithmetic) |
| Price to backlog | ~0.11× | $50B ÷ $439B, before $176B of capex to earn it |
| Backlog net of capex | ~$263B | $439B − $176B, undiscounted, before interest, operating costs and taxes |
Neither multiple is a fair valuation on its own. The revenue multiple ignores the leases; the backlog multiple ignores that most of the rent arrives over 20-year terms starting in 2028 and needs the capex first. The right public-market frame is a discounted lease book with construction risk, which is how investors price listed data center developers, and the market for those names soured during the autumn: The Information tied SB Energy's delay to stress in CoreWeave's bonds, and Australian developer Firmus withdrew its IPO in October.
| Signal | Reads as |
|---|---|
| S-1/A No. 3 with September 30 financials (November 19, 2026) | Supports The company keeps the filing current rather than letting it lapse |
| Price range and share count still blank | Neutral No launch yet; a range amendment comes before any roadshow |
| Anthropic priced at $83 on November 18, then closed below $83 on November 24 (CNBC) | Against SB Energy's executives were reported to be watching Anthropic's trading before deciding on December |
| First data center rent (Cosmos) expected in the fourth quarter of 2026 | Supports A first lease in service would give the roadshow an operating proof point |
| Financial statements go stale around mid-February 2027 | Neutral A slip past that point means waiting for audited 2025-26 year-end figures |
QuantLogix's base case is a first-quarter 2027 listing, after Cosmos starts paying rent and once the AI listings that came before it have settled. A December 2026 launch remains possible if Anthropic recovers. The deal most likely prices below the $50 billion target; NVIDIA's purchase at the IPO price and its 10%-discount prepaid forward show where strategic money is already committed.
| Company | Ticker | Overlap with SB Energy |
|---|---|---|
| CoreWeave | CRWV | AI capacity sold to a few large labs, OpenAI among them; its bond spreads were the stress signal cited in SB Energy's delay |
| Vistra · Constellation | VST · CEG | Listed power producers priced on contracted supply to data centers |
| NextEra Energy | NEE | The largest listed U.S. solar and storage developer: the closest match to SB Energy's revenue today |
| Equinix · Digital Realty | EQIX · DLR | Listed data center landlords with diversified tenant bases: the profile SB Energy lacks, with two related-party tenants |
| Anthropic | ANT | The template for strategic Class N placements; not a business comp |
No listed company combines a 20-year lease book this concentrated with a construction program this large. Expect the roadshow to pitch SB Energy as a contracted infrastructure yield story and the market to test it as an OpenAI credit story.
| Risk | Severity | Detail |
|---|---|---|
| Tenant concentration and credit | High | All signed data center leases are with SoftBank or OpenAI affiliates; OpenAI is not investment-grade |
| Guaranty limits | High | NVIDIA's guaranty covers 4.25 of 8.0 GW-IT at PORTS-Pike, is capped at $105B, declines over time and can terminate |
| Funding the build | High | $176B of backlog-associated capex; $996.7M unrestricted cash and $4.6B of debt at September 30, 2026 |
| Execution at PORTS-Pike | High | 17 buildings and 9.2 GW of new gas generation on a former DOE site; federal permitting still in progress |
| Related-party governance | Medium | SoftBank controls the board and is a tenant; controlled-company exemptions apply |
| Revenue quality | Medium | Unrealized swap gains were $63.3M of 2025's $213.5M revenue |
| Community and political risk | Medium | IFR reported investor caution over the data center backlash heading into the November 2026 midterms |
| IPO window | Medium | Delayed once on valuation; Anthropic's post-IPO trading is the reported swing factor |
| Vehicle | Ticker | Type | Exposure |
|---|---|---|---|
| SoftBank Group | 9984 (Tokyo) · SFTBY | Controlling shareholder | The direct look-through today, diluted by SoftBank's much larger OpenAI, Arm and Vision Fund positions. IFR reported SoftBank arranging a margin loan against part of its SB Energy stake |
| NVIDIA | NVDA | Strategic investor and guarantor | $3.0B of Class N stock at or below the IPO price, plus contingent exposure under the $105B guaranty; immaterial to NVIDIA's size |
| OpenAI | Private | Tenant and warrant holder | No listed route; see the QuantLogix OpenAI deep dive |
| The IPO | SBE | Direct | Common stock once a price range is filed and the offering launches |
SB Energy offers the most transparent 2027 AI-infrastructure IPO on file: a public prospectus, a ticker, 21 banks and $3.0 billion of NVIDIA money committed. It also offers the most concentrated one: $439 billion of backlog that depends on two related parties, a $176 billion build that has not started at its largest site, and a business that made $213.5 million last year. The $50 billion target was too rich for investors in September; the deal now waits on Anthropic's trading and Cosmos's first rent check. The event that changes the analysis is the price-range amendment: it sets the valuation, SoftBank's retained stake and NVIDIA's share count in one page. Until then, SB Energy is a watchlist name for the first quarter of 2027.